When Hizbullah Secretary General His Eminence Sayyed Hassan Nasrallah declared that houses will return "more beautiful than they were", Jihad al Binaa adopted this motto as a standard for the quality of its work.  It believed that the buildings should be rebuilt more beautiful than they were, and that it should satisfy and lighten off residents as much as possible.

Through establishing a specialized office, Jihad al Binaa classified the buildings damaged due to the July 2006 aggression. The organization also technically supervised the implementation in some sectors, and the achievement was as follows:

1-Examining all affected building, and preparing a detailed form for each affected section with a description of the construction status.

2-Preparing a general map for the affected area, holding tests for the sensitive buildings, and classifying damages as follows:

-         Demolished building, or those that should be demolished. These buildings were handed over to WAAD (removing rubbles or demolishing)

-          Highly affected buildings (requires eviction and immediate support), classified among structural repairs.

-          Average affected buildings (requires eviction), classified among limited structural repair buildings.

-          Slightly affected buildings (don’t require eviction) – was handed over to the compensation sector to directly start paying compensation for residents repairing their units.

-          Buildings that require reconstruction of common parts – handed over to the common parts office to start implementation.

Coordination took place with the following sides:

-          Engineering directory in the Lebanese Army regarding dismantling the unexploded rockets launched by the "Israeli" enemy, and that are still under the residential buildings.

-          The classification was presented to the Higher Commission for Relief so it would accomplish its duties

-          The Ministry of Emigrants, the National Immigration Fund, and municipalities.

  

In this context, the following was conducted:

reconstruction

varnish

isolation

beautifying varnish

 800 buildings

 200 buildings

 45 buildings

 104 buildings

 

As for the sum of buildings examines is 2695 in coordination with the Ministry of Emigrants, and 26613 in coordination with the advisory Khatib and Alami.